Check new Project

priority lands in Golestan Province

Drainage operations for priority lands in Golestan Province, covering an area of 6,500 hectares within the counties of Aq Qala, Bandar Torkaman, and Gomishan (Priority 2).
Completion of the main collector drainage canal with a length of 16 kilometers Construction of trash and sediment traps for the Ziyarat River Development of the Sijoval reservoir (dredging, surface expansion, and volume increase) Construction of an earthen temporary storage reservoir and a coastal pumping station Construction of a coastal dike with a length of 2 kilometers Canal lining over a length of 8 kilometers Construction of three pedestrian bridges Completion of the Sijoval pumping station

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
When an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting.

Challenges

Services:

Irrigation & drainage

Clients:

Golestan Regional Water Company

Date:

June 17, 2023

Location:

Golestan

How We Solve This Project

Sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehen derit in voluptate velit esse cillum dolore eu fugiat nulla pariatur.

Lorem ipsum dolor sit amet, consectetur adipisicing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse cillum dolore eu fugiat nulla pariatur. Excepteur sint occaecat cupidatat non proident sunt.